0 $0.00
0 items in your cart Checkout
Ooops no items were found.
Try something else.

Your cart is empty!

Welcome to our updated website!

We're excited to introduce new features, a refreshed layout, and improved homepage navigation.
Stay tuned for more enhancements in the coming weeks!

If you have any questions, please reach out to us via email at sales@excelsupplycompany.com 

Leader Measuring Tapes, 3/8 in x 100 ft

Category Tape Measures
Leader Measuring Tapes, 3/8 in x 100 ft

Leader Measuring Tapes, 3/8 in x 100 ft

Item Code: 182-HC256N
Category Tape Measures
Manufacturer Apex Tool Group

Specifications

Weight

1.65lb

Height

1.2in

Width

5.1in

Length

5.3in

Blade Finish

Chrome Clad

Blade Length [Nom]

100 ft

Blade Material

Steel

Blade Style

B7

Blade Width [Nom]

3/8 In

Brand

Crescent Lufkin

Case Material

Vinyl-Covered Steel

Category

Tape Measures

Color

Black

End Type

Folding End-Hook Ring

Graduation(s)

1/8 in

Increment @ Scale

1/8 in @ 1.000 ft

Measuring System

Inch

No. of Scales

1

Reel Type

Closed Reel

Return Motion

Manual Wind-Up

Type

Single Side Tape

Wt.

1.67 lb

$151.85 / EA
/
( 1 EA )
LIST PRICE $151.85
%
- +
Compare

Leader Measuring Tapes, 3/8 in x 100 ft

Category Tape Measures
Leader Measuring Tapes, 3/8 in x 100 ft

Leader Measuring Tapes, 3/8 in x 100 ft

Item Code: 182-HC256N
Category Tape Measures
Manufacturer Apex Tool Group

Specifications

Weight

1.65lb

Height

1.2in

Width

5.1in

Length

5.3in

Blade Finish

Chrome Clad

Blade Length [Nom]

100 ft

Blade Material

Steel

Blade Style

B7

Blade Width [Nom]

3/8 In

Brand

Crescent Lufkin

Case Material

Vinyl-Covered Steel

Category

Tape Measures

Color

Black

End Type

Folding End-Hook Ring

Graduation(s)

1/8 in

Increment @ Scale

1/8 in @ 1.000 ft

Measuring System

Inch

No. of Scales

1

Reel Type

Closed Reel

Return Motion

Manual Wind-Up

Type

Single Side Tape

Wt.

1.67 lb

$151.85 / EA
/
( 1 EA )
LIST PRICE $151.85
%
- +
Compare
SEARCH ×